Building Name
Email inspection to
Notes: Glass; High / Low Dusting; Horizontal Surfaces;; Phone(s); Water Fountains; Furnishings;Light switches and door handles; Flooring Bathroom(s) Breakroom(s) + Sinks; Microwaves; Refrigerator; Urinal; Toilet; Dispensers; Hand Rails, Consumables
Lobby
-2
-4
-6
-8
-10
-12
-14
-16
Lobby
Exam Rooms
-2
-4
-6
-8
-10
-12
-14
-16
Exam Rooms
Conference Rooms
-2
-4
-6
-8
-10
-12
-14
-16
Conference Rooms
Bathroom & Breakroom
-2
-4
-6
-8
-10
-12
-14
-16
Bathroom & Breakroom
Office(s); Common Area(s)
-2
-4
-6
-8
-10
-12
-14
-16
Office(s); Common Area(s)
Inspection Results
Pass
Remedy Required
Failed: Immediate Remedy Required
Inspection Results
Inspection Score ⭐️ (100% - points missed) /20)
Let's Go!